//
you're reading...
Construction, Residential Design

A House for John

0239-004-house-for-john

John’s house is finally under way. Saturday, I helped notch the piles and build the rim joists along with a group of students from Keesler. Since then, Jeremy, Molly, Doug, and Colleen have been making progress on the floor.

d

I had to photograph this: the builders consulting the construction drawings. It actually does happen!

d

Beams and rim joists.

d

Badass: Molly performing self-surgery with a pocketknife.

Discussion

Trackbacks/Pingbacks

  1. Pingback: A House for John, 2 « Southern Live Oak - January 19, 2010

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: